Dynojet 424x: Installation Guide User Manual
Page 153

I N D E X
Version 7
In Ground Model 424x/424xLC
2
Automotive Dynamometer Installation Guide
Index-iii
R
rail clamp 3-7
rail tie 3-7
rail tie assembly 3-7
rail tie clip 3-8
ram 3-26
red head anchor
contact information A-1
installation A-2
setting tool A-3
warnings A-1
requirements
chassis 1-4
compressed air 1-8
computer specifications 1-8
drill and drill bit 1-8
electrical 1-8
environmental 1-8
fire suppression 1-9
forklift 1-9
hydraulic motor 1-9
tie-down straps 1-9
routing cables 3-12–3-24
25-pin 3-12, 3-13, 3-16, 3-20
4WD power 3-12, 3-13, 3-17, 3-22
air hose 3-12, 3-13, 3-16, 3-21
brake signal 3-12, 3-13, 3-16, 3-21
controller 3-12, 3-17, 3-21
dyno movement pendant 3-12, 3-13, 3-16, 3-21
hydraulic pump power 3-13, 3-16, 3-21
identifying cables 3-12
load cell 3-12, 3-16, 3-21
opening crossbar 3-20
pickup card 3-12, 3-13, 3-16, 3-20
power supply 3-13, 3-17, 3-22
temperature sensor 3-12, 3-17, 3-21
theta power 3-12, 3-17, 3-21
theta signal 3-12, 3-17, 3-21
RPM pickup 5-5–5-7
primary inductive pickup 5-7
secondary inductive pickup 5-6
runner assemblies 3-36, 3-43
runner clamps, extended D-4
runner mounts 3-35, 3-42
runner mounts, extended D-2
runner supports 3-35
runner tie straps 3-44
S
SAAR brake
pressure gauge 5-11, 5-12
regulator 5-11, 5-12
shoe clearance 5-13
secondary inductive pickup 5-6
setting tool A-3
spline hub 4-8
splined shaft 4-8
standard torque values
grade 5 E-2
grade 8 E-3
stationary dyno upgrade
air fittings C-3
lift kit C-2
strap 1-9
T
technical support 1-3
temperature sensor
installing 4-6
temperature sensor cable
identifying 3-12
routing 3-17, 3-21
wiring 3-18, 3-23
testing voltages B-3, B-7
theta power cable
identifying 3-12
routing 3-17, 3-21
theta signal cable
identifying 3-12
routing 3-17, 3-21
wiring 3-18, 3-23
tie-down straps 5-3
torque cell calibration
calibration arm 4-21
calibration number 4-21
calibration weights 4-23
torque gauge 4-24
torque module
installation 4-16–4-19
torque values
metric E-4
standard E-2
track assembly 3-5–3-8
installing 3-7
layout 3-6
length 1-4
rail clamp 3-7
rail tie 3-7
rail tie assembly 3-7
rail tie clip 3-8
width 1-4
U
u-joint 4-8
upgrade
air fittings C-3
lift kit C-2
W
warnings v
weight 1-4
width 1-4
wiring the hydraulic motor 3-30
Z
zero calibration 4-20