Drill test, Initialize monitor, Drill test initialize monitor – Great Plains NTA2007HD Predelivery Manual User Manual
Page 96
92
Great Plains Manufacturing, Inc.
NTA607HD
166-283Q
02/09/2011
Drill Test
Complete this section before installing Options (if any).
Initialize Monitor
375. Make a monitor connection per Operator manual
and DICKEY-john
®
ACC manuals.
Note: An operator monitor system is required to operate
the fold-enable solenoid valves.
376. Run a system configuration, and allow the monitor
to detect and configure all CANbus modules. If the
WSMBs were correctly installed in serial-number
order, the default row assignments should require
no changes.
Diagnose and correct any faults or alarms.
377. Bleed lift hydraulics per the Operator manual.
378. Test the Lift function.
379. Adjust Lift Switch per Operator manual.
380. Bleed Fold/Transfer hydraulics per Operator man-
ual.
381. Test Lift Lock
382. Test Fold
383. Pre-set weight transfer valves per the Operator
manual, Appendix B.
384. Adjust hose lengths.