Install walkboard railing, Remove pressure gauge bracket – Great Plains NTA2007HD Predelivery Manual User Manual
Page 19
Great Plains Manufacturing, Inc.
Cart Assembly
15
02/09/2011
166-283Q
Install Walkboard Railing
Refer to Figure 20 (depicting a dual-hopper bracket asy.)
If the manifold pressure gauge bracket
is not
installed, skip to “Install Walkboard Extension” on
page 17.
Remove Pressure Gauge Bracket
27. Loosen clamps:
800-126C CLAMP WRM DRV #5 SS (.44-.70)
and disconnect sense line tubing:
990-080R HOSE 3/8 ID 150PSI EPDM
Save the clamps. Prevent hose(s) from touching
ground. Do not disconnect hoses at manifold.
28. Remove and save two sets:
803-014C NUT HEX 3/8-16 PLT
804-013C WASHER LOCK SPRING 3/8 PLT
804-011C WASHER FLAT 3/8 USS PLT
802-079C HHCS 3/8-16X1 1/4 GR5
then remove and carefully save the bracket
assembly
. Do not remove the gauges.
186
145
205
224
223
307
180
Null4:
Figure 20
Gauge Bracket Dismount
Q0017
145
180
307
205
224
223
186
145