beautypg.com

Gather hoses and harnesses, Connect cart/implement plumbing, Interconnect fertilizer booms – Great Plains NTA2007HD Predelivery Manual User Manual

Page 91

background image

Great Plains Manufacturing, Inc.

Contents

Index

Implement Assembly

87

02/09/2011

Contents

Index

166-283Q

Gather Hoses and Harnesses
Start with Tower A, then complete towers B-D, and if dou-
ble-shoot; E-H.

Refer to Figure 156
356. Select one:

800-150C CABLE TIE 22.2 LONG REL.

Collect all the hoses for a single tower near the bot-
tom of the dimpled region of the tower tube. Check
that no kinks are caused in any hoses. Secure with
snug cable tie.

Null4:

Connect Cart/Implement Plumbing

Interconnect Fertilizer Booms

Null4:

Figure 156

Hose Gathering

Q0066

175

175

This manual is related to the following products: