Install Unfold/Transfer Hose (F)
Refer to Figure 85, 86 on pages 52, 53 and Figure 88
198. Select one:
841-451C HH1/2R2 148 3/4FJIC 3/4MORB
199. Check that this hose has a male QD fitting at one
end. If it does not, the needed fitting may be found
at the cart hydraulic bulkhead, as part of a coupler:
811-204C CP 3/4FORB QD BH
Remove the male fitting from the coupler and
secure to the MORB end of hose
.
200. Connect the QD end of hose
to cart bulkhead
port F.
Leaving a few cm/inches of slack, route hose
under bottom rear station of hitch clamp
.
Leaving little slack, route hose
under the bot-
tom left station of mid hitch clamp
.
Leaving about 25cm (10in) slack, route hose
under the top right station of center section portal
clamp
.
Leaving little slack, route hose
under the bot-
tom front station of center section clamp
.
Leaving enough slack for hose
to sag to the
wing pivot center-line, route the hose through the
bottom front station of wing clamp
.
Connect the FJIC end of hose
to the inlet tee
at the valve/gauge assembly
.
Install Sump Hose (G)
201. Select one:
841-162C HH3/8R2 184 3/4MORB 9/16FJIC
Check that this hose has a male QD fitting at one
end. If it does not, fit one per step 199.
202. Connect the QD end of hose
to cart bulkhead
port G.
Leaving a few cm/inches of slack, route hose
under bottom front station of hitch clamp
.
Leaving little slack, route hose
under the bot-
tom right station of mid hitch clamp
.
Leaving about 25cm (10in) slack, route hose
under the top left station of center section portal
clamp
.
Leaving little slack, route hose
under the top
front station of center section clamp
.
Leaving enough slack for hose
to sag to the
wing pivot center-line, route the hose through the
bottom rear station of wing clamp
.
Connect the FJIC end of the hose to the dump port
(bottom) tee
at the cart weight transfer relief
valve/gauge assembly
(this is the right valve).
Null4:
Null4:
Null4:
A
Marker (option)
B
Marker (option)
C
Implement Lower
D
Implement Lift
E
Lock/Fold
F
Unfold/Transfer
G
SUMP
Figure 87
Cart Bulkhead Ports
848-526C
296
267
296
296
Null4:
Figure 88: Transfer In:
Valve/Gauge Assembly
Q0070
120
1
2
296
296
296
296
296
C09
296
120
289
Null4:
Figure 89
Assembly
w/ Hoses
Q0073
120
296
289
289
289
289
289
289
289
C09
120