Implement Assembly
61
02/09/2011
166-283Q
Install Center Section Harnesses
The monitor, lift switch and lighting harness segments
run from the cart to various elements on the center sec-
tion. It is recommended that the center section harness
segments be routed prior to weight installation, even
though towers, WSMBs, sensors, switch and lights are
not yet installed (some center harness segments run
under weights).
Route Lighting Harness
Refer to Figure 106 and Figure 107
255. Select one:
833-521C LIGHT HARNESS EU NTA607 IMPLMT
Mate the Deutsch connector end of implement
harness
to the receptacle
at the cart bulk-
head.
Allowing 25cm (10in) slack, route harness
through the top front clip of hitch front clamp
.
Route harness
through the top left clip of mid-
hitch clamp
.
Allowing 25cm (10in) slack, route harness
through the bottom right clip of left hitch portal
clamp
.
Refer to Figure 107
256. Route harness
through cable clips
on left
inside face of center section frame tubes and left
side of the rear lower parallel arm weldment.
Leave a few cm/in of slack in the cable at the front
and rear parallel arm pivots.
Null4:
Null4:
Figure 106
Cart-Implement Lighting Connection
Q0074
287
286
287
287
286
287
Null4:
Figure 107
Route Lighting Harness
Q0068
Facing Rear
Facing Right
287
287
287
Facing Rear
Facing Rear
U
D
F
B
L
R
287
287
287
1
F
B
L
R
Null4:
Figure 108
Center Section Lighting Route
Q0075