Great Plains NTA2007HD Predelivery Manual User Manual
Export pre-delivery instructions, Manufacturing, inc, 6m no-till heavy duty air drill
Manufacturing, Inc.
© Copyright 2011
Printed 02/09/2011
166-283Q
NTA607HD
i
Export Pre-Delivery Instructions
NTA607HD
6m No-Till Heavy Duty Air Drill
Read this manual entirely. When you see this symbol, the subsequent
instructions and warnings are serious - follow without exception.
Your life and the lives of others depend on it!
Illustrations may show optional equipment not supplied with standard unit, or, as above,
may show NTA2007HD model where differences are immaterial to present topic.
Null4:
Null4:
31285
FigureSpacer:
EN
This manual is related to the following products:
Table of contents
Document Outline
- Export Pre-Delivery Instructions
- Table of Contents
- Important Safety Information
- Look for Safety Symbol
- Be Aware of Signal Words
- Prepare for Emergencies
- Be Familiar with Safety Decals
- Wear Protective Equipment
- Use A Safety Chain
- Avoid High Pressure Fluids
- Minimize Radiation Exposure
- Tire Safety
- Use Safety Lights and Devices
- Keep Riders Off Machinery
- Transport Machinery Safely
- Shutdown and Storage
- Practice Safe Maintenance
- Safety At All Times
- Introduction
- Preparation
- Rack Unloading
- Cart Assembly
- Clear Cart Rack
- Remove Transport Wheels
- Free Cart Frame
- Position Cart Frame
- Clear Hopper(s)
- Check Hopper Straps
- Free Hopper Frame
- Lift Hopper Frame
- Prepare Meters
- Mount Hopper Frame on Cart
- Install Walkboard Railing
- Railing and Walkboard Extension
- Free Tongue
- Move Tongue
- Mount Tongue
- Install Hitch Fittings
- Install Radar
- Install Manual-Pak™
- Install Contact Drive
- Mount Cart Wheels
- Align and Mate Meters
- Second Contact Drive Chain
- Cart Fertilizer Plumbing (option)
- Implement Assembly
- Clear Center Rack
- Tip Rack Center Section Upright
- Support Center
- Free Center from Rack
- Lift Center from Rack
- Upright Center Rack
- Install Cart-Implement Link
- Connect Center Section to Link
- Install Lift Assist
- Install Rear Pull Link
- Install Casters
- Complete Cart-Implement Link
- Release Wings
- Install Wings
- Install Gauge Wheels
- Install Fold Cylinders
- Install Implement Hydraulics
- Install Center Section Harnesses
- Route Primary Air Hoses
- Install Implement Booms
- Install Weights
- Install Towers
- Install WSMBs
- Install Row Harnesses
- Connect Primary Hoses to Towers
- Connect WSMBs
- Terminate CANbus
- Install Secondary Seed Hoses
- Connect Sensor Leads
- Connect Cart/Implement Plumbing
- Interconnect Fertilizer Booms
- Install Lift Switch
- Install Lights
- Install Decal Plates
- Closeout
- Drill Test
- Install Options
- Appendix
- Torque Values Chart
- Hydraulic Connectors and Torque
- Tire Inflation Chart
- Seed/Fertilizer Hose Port Maps
- Chain Setup
- Part List
- Abbreviations
- Index