Tools Required

• Two mobile lifters, such as some combination of

forklifts, hoists or cranes, one of which has a capacity
of at least 2,300 kg (5,000 lbs).

Refer to Figure 5
• Drill Operator and Parts manuals:

Operator manual (166-283M) and
Parts manual (166-283P)

These must be available during assembly and check-
out. They may

a

be found inside the black polymer

Manual-Pak™ enclosure

, which is shipped loose

at the base of the implement center section rack, and
mounted on the tongue weldment at step 62.

• Adjustable support stands

• Jacks

• Cartons or tote boxes for temporary storage

• 3 meter fish tape, stout line or cable snake

• Touch-up paint in Great Plains colors:

GREEN:DuPont 262,PPG 43817,Pantone 356C
BUCKSKIN:DuPont C854512,PPG 25501,Pantone
465C
Use gloss exterior enamel suitable for use on metal
surfaces.

• Basic hand tools, including:

+ ladder
+ torque wrench
+ angle grinder
+ plastic tubing cutter

• If liquid fertilizer installed:

15 liters (4 gallons) of RV antifreeze
(

α-propylene glycol)

a. These manuals are also available in PDF form on the Great Plains web site.

Null4:

Figure 5

Manual Pak

Q0002

283

283

This manual is related to the following products: