Leica Geosystems GPS System 500 - Technical Reference Manual User Manual
Page 24

24
2. Set-up and Connection
Technical Reference Manual-4.0.0en
Procedure
1. If a pillar plate is being used,
locate it on the pillar.
2. Screw the tribrach to the pillar
plate or the pillar. Level the
tribrach.
3. Place and lock the GRT146
Carrier in the Tribrach.
4. Screw the Antenna onto the
Carrier.
5. Check that the Tribrach is still
level.
6. Connect the GPS Receiver to
the Antenna using the GEV120
Antenna cable.
7. Plug the GEB121 batteries into
the GPS Receiver.
8. Attach the TR500 Terminal to
the Receiver if required.
9. Insert the PCMCIA Flash Card
into the Receiver.
10. Switch on the system using the
ON/OFF button.
11. The Receiver can be placed in
the Transport Case for additional
protection.
The Next Steps
If the Receiver has been pre-pro-
grammed and the TR500 is not being
used, further guidance is available in
Chapter 3.
If the Receiver has been pre-pro-
grammed and the TR500 is being
used, further guidance is available in
Chapter 7.
If the Receiver requires programming
with the TR500, further guidance is
available in Chapter 5.
When Using the GAD31
adapter and GRT144 carrier,
ensure that the Antenna and GAD31
assembly slide down the full length of
the GRT144 stub. An incorrectly
mounted Antenna will have a direct
effect on your results.
In wet conditions the Re-
ceiver can be placed in the
transport case during use for extra
protection. Try to shut the case as
completely as possible.
If the Receiver is left in the
case during use in tempera-
tures exceeding 25°C, the lid should
be left open. Refer to Appendix A for
operating and storage temperatures.
Use an external battery such
as GEB71 to extend the
operating time past 6 hours.