beautypg.com

4 real-time rover, surveying new points – Leica Geosystems GPS System 500 - Technical Reference Manual User Manual

Page 181

background image

181

7. Measuring with System 500

Technical Reference Manual-4.0.0en

7.4 Real-Time Rover, Surveying New Points

Set up the equipment as described in
Chapter 2. Attach the Terminal.

Switch on. The Main Menu will be
displayed. The system will automati-
cally start searching for satellites.

Select Survey and press CONT (F1).

Config Set - Defines the Configura-
tion Set to be used. The last Configu-
ration Set used or created will be
taken by default although any other
Configuration Set may be selected.

Job - Defines the Job to be used.
This is the Job where any point and
observation data will be stored.

Coord Sys - Displays the coordinate
system that will be used for the
display of coordinates. For this type of
work, a local coordinate system
should be used although this is not
strictly essential. Press CSYS (F6) to
change the Coordinate System.
Information on determining the
coordinate system is given in section
11.1.

Antenna - Defines the Antenna setup
to be used. The Setup defined in the
Configuration Set will be taken by
default although any other setup may
be selected. For Real-Time Rover
work, this will normally be AT501/502
Pole
.

Press CONT (F1) when you have
made your selection.