beautypg.com

Bio-Rad ChromLab™ Software User Manual

Page 123

background image

Plumbing NGC Systems

Installation Guide

| 121

2.

If your system has two sample inlet valves:

a.

Connect tubing from the Out port on sample inlet valve 1 (S1) to the
sample pump inlet manifold.

b.

Connect tubing from the Out port on sample inlet valve 2 (S2) to port 8 on
S1.

c.

Connect inlet tubing to ports 1–7 on S1 and to ports 1–8 on S2 as needed.

3.

Immerse the inlet tubing in sample containers.

Plumbing Outlet Valves

Each outlet valve module includes all necessary tubing. The tubing is approximately

5' (1.5 m) in length. Determine the length of tubing you need and cut it to the

appropriate length.

To plumb the outlet valves

1.

If your system has only one outlet valve:

a.

Connect tubing from the Out port on the conductivity monitor or pH
monitor to the In port on the outlet valve.