Plumbing the ngc discover system – Bio-Rad ChromLab™ Software User Manual
Page 115

Plumbing NGC Systems
Installation Guide
| 113
Plumbing the NGC Discover System
11 lists the tasks for plumbing the NGC Discover™ system. The tasks are
explained in detail in the sections that follow.
Note:
Ensure that you complete the plumbing tasks in the section
before continuing.
1.
Inlet tubing to the left pump head wash port on the sample pump
2.
Pump head wash priming line
to the right pump head wash port on the
sample pump
3.
1/4-28 union to the
pump head wash priming line
on the sample pump
4.
Inlet tubing to the other end of the 1/4-28 union on the sample pump
5.
Inlet tubing to ports Q1–Q4 on the buffer blending valve
6.
Inlet tubing to the remaining ports on the buffer inlet valves
7.
Inlet tubing to the inlet manifold on the sample pump
8.
Waste tubing to the Cal Out port on the pH valve
9.
Priming line
to the calibration inlet port (Cal In) on the pH valve
10.
Tube #2 from the 40 psi backpressure regulator to the inlet of the pH
valve
11.
Tube #4 from the 40 psi backpressure regulator to the Common inlet port
on the BioFrac fraction collector diverter valve
The figure on page
114 shows the Point-to-Plumb connections for the
NGC
Discover system.
Table 11.
Plumbing tasks for the NGC Discover system
Tasks