beautypg.com

Bio-Rad ChromLab™ Software User Manual

Page 113

background image

Plumbing NGC Systems

Installation Guide

| 111

To plumb the buffer blending valve

Connect the inlet tubing to ports Q1–Q4 on the buffer blending valve.

Note:

The buffer inlet tubing is color-coded to identify the different buffer

solutions.

The color scheme for the tubing and ports is defined as follows:

Green

Q4

High salt buffer

Yellow

Q3

Water

Blue

Q2

Buffer base

Red

Q1

Buffer acid

To plumb the pH valve

1.

Connect the pump head wash priming tubing to the Cal In port on the pH valve.

2.

Connect waste tubing to the Cal Out port on the pH valve.

Tubing color

Port

Solution