beautypg.com

MacDon CA25 OM User Manual

Page 78

background image

SECTION 7. OPERATION

169593

76

Revision B

d. Re-position

left arm cylinder as follows:

NOTE

Reel components are not shown for
clarity.

1. Remove pin (A) securing cylinder (B) to

bracket/light assembly (C).

2. Remove bolts (D) securing bracket (C) to

reel arm and remove bracket/light
assembly.

3. If necessary, remove plastic tie securing

harness to bracket or reel arm.

4. Swivel light to working position as shown.

5. Re-position bracket/light assembly (C) on

reel arm as shown, and re-install the four
bolts (D) to secure bracket to reel arm.
Tighten bolts.

6. Push reel back, and re-install cylinder (B) to

bracket with pin (A). Secure pin with cotter
pin.

7. Secure light harness to bracket with plastic

tie wrap.

e. Check reel clearance to back sheet, upper

cross auger (if installed) and reel braces.

f. Adjust reel tine pitch if required. Refer to

Section 7.9.10 Reel Tine Pitch, or Section
8.12.1 Reel Clearance to Cutterbar for
adjustment procedures.

D

D

A

REARWARD POSITION

B

C

D

D

FORWARD POSITION

A

D

D

B

C

This manual is related to the following products: