beautypg.com

MacDon CA25 OM User Manual

Page 163

background image

SECTION 8. MAINTENANCE AND SERVICING

169593

161

Revision B

3. Move RH reel sideways to separate the reel

tube (F) and U-joint (E).

4. Remove the chain (C).

5. Route new chain (C) over U-joint (E), and

locate on sprockets.

6. Adjust the chain tension. Refer to Section

8.12.4.1 Tension Adjustment: High Torque
Drive.

7. Position RH reel tube (F) against reel drive,

and engage stub shaft into U-joint (E) pilot
hole.

8. Rotate reel until holes in end of reel tube

and U-joint line up.

9. Apply

Loctite

®

#243 (or equivalent) to four

1/2 in. bolts (G), and install with

lock-washers.

10. Torque to 75–85 ft·lbf (102–115 N·m).

11. Remove temporary reel support.

12. Re-install drive covers.

Method 2: Breaking the Chain

1. Grind off head of a link rivet on chain (H),

punch out the rivet, and remove chain.

2. Grind off the head from one of the link

rivets on the new chain, and punch out rivet
to separate the chain.

3. Locate ends of chain on sprocket.

4. Install

pin

connector

(J) (not available as a

MacDon part) into chain, preferably from
sprocket backside.

5. Install connector (K) onto pins.

6. Install spring clip (L) onto front pin (M) with

closed end of clip in direction of sprocket
rotation.

7. Locate one leg of clip in groove of aft pin

(N).

8. Press other leg of spring clip over face of

aft pin (N) until it slips into groove. Do not
press clip lengthwise from closed end.

9. Ensure clip is seated in grooves of pins.

f. Adjust the chain tension. Refer to Section

8.12.4.1 Tension Adjustment: High Torque
Drive.

g. Re-install drive covers.

E

G

C

F

E

H

DIRECTION OF ROTATION

N

M

J

K

L

This manual is related to the following products: