MacDon CA25 OM User Manual
Page 106
SECTION 8. MAINTENANCE AND SERVICING
169593
104
Revision B
8.4.1 Maintenance
Schedule/Record
ACTION:
- Check
- Lubricate
- Change
MAINTENANC
E
RECORD
Hour Meter Reading
Date
Serviced By
FIRST USE
Refer To Section 8.4.2 Break-In Inspections.
100 HOURS OR ANNUALLY
Auger to Pan and Feed Draper Clearance
- Section 8.8.1
Draper
Seal
-
Section
8.11.5
Gearbox
Lubricant
Level
-
Section
8.4.5.4
Reel
Drive
Chain
Tension
-
Section
8.12.4
Reel Tine / Cutterbar Clearance
- Section 8.12.1
Sickle
Drive
Belt
Tension
-
Section
8.9.8
Wheel Bolt Torque - Section 8.13.1
Sickle Drive Box Lubricant Level
- Section 8.4.5
Sickle Drive Box Mounting Bolts
- Section 8.9.10.1
Auger
Drive
Chain
-
Section
8.8.2
Float
Pivots
-
Section
8.4.5
Float
Spring
Tensioners
-
Section
8.4.5
Reel
Drive
Chain
-
Section
8.4.5
Upper Cross Auger RH Bearing
- Section 8.4.5
END OF SEASON
Refer To Section 8.4.4 End of Season.
10 HOURS OR DAILY
NOTE: A RECORD OF DAILY MAINTENANCE IS NOT
NORMALLY REQUIRED, BUT IS AT THE
OWNER/OPERATOR’S DISCRETION.
Hydraulic Hoses and Lines - Section 8.5.3
Sections, Guards, Hold-downs
- Sections 8.9.1, 8.9.6, 8.9.7
Tire Pressure - Section 8.13.3
Sickle (except in sandy conditions)
- Section 8.4.5
25 HOURS
Hydraulic Oil Level at Reservoir
- Section 8.5.1.1
Sickle Head(s) - Section 8.4.5
(continued next page)