beautypg.com

MacDon CA25 OM User Manual

Page 140

background image

SECTION 8. MAINTENANCE AND SERVICING

169593

138

Revision B

L

d. Loosen two bolts (H) on sickle drive mounting

bracket.

e. Turn adjuster bolt (J) to loosen the two V-belts

(K), and remove belts.

f. Remove bolt in plate

(L) in left endsheet at
sickle drive box, and
remove plate. This
provides clearance
between pulley and
endsheet for the belt
when it is removed.

g. Slip timing belt off

sickle drive box pulley,
and route belt between
sickle drive box pulley and endsheet.

h. Remove belt from drive pulley.

Installation: Left End Timing Belt

a. Locate timing belt (M) onto drive pulley (N).

b. Route belt between sickle drive box pulley (O)

and endsheet, and locate on sickle drive box
pulley and over idler (P).

NOTE

When installing new belt, never pry
belt over pulley. Be sure adjusting
device is fully loosened, then tension
belt.

c. Position V-belts (K) onto drive pulleys.

d. Turn adjuster bolt (J) to move drive motor until

a force of 12 lbf (53 N) deflects V-belts (K)
1/8 in. (3 mm) at mid-span.

e. Tighten two bolts (H) on drive mounting

brackets.

(continued next page)

J

H

K

J

H

K

N

M

O

P

This manual is related to the following products: