YKMAKE HOLD

YKEWAIT GOTO(HOLD)

8.

Restart the monitoring of HyperSwaps by using Business Continuity Manager.

For details, see

“Operation startup procedure” (page 454)

.

9.

Use Remote Web Console to set a Delta Resync control path required for each copy pair.

Operation is returned to normal.

Operating procedure during a path failure between the primary storage system and
the local storage system

The following are the operating procedures taken when a path between the primary storage system
and the local storage system is in failure state.

Preparing

To prepare for maintenance:
1.

Use TPC-R on the primary host to stop Cnt Ac-S copy pairs with the HyperSwap attribute.

480 Maintenance and troubleshooting operations