Preparing – HP XP Racks User Manual
Page 480
•
YKMAKE HOLD
•
YKEWAIT GOTO(HOLD)
8.
Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see
“Operation startup procedure” (page 454)
9.
Use Remote Web Console to set a Delta Resync control path required for each copy pair.
Operation is returned to normal.
Operating procedure during a path failure between the primary storage system and
the local storage system
The following are the operating procedures taken when a path between the primary storage system
and the local storage system is in failure state.
Preparing
To prepare for maintenance:
1.
Use TPC-R on the primary host to stop Cnt Ac-S copy pairs with the HyperSwap attribute.
480 Maintenance and troubleshooting operations
This manual is related to the following products: