Preparing the hardware (3dc multi-target (cnt, Ac-j z x cnt ac-j z) – HP XP Racks User Manual
Page 189
![background image](/manuals/398324/189/background.png)
Figure 86 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration example
Preparing the hardware (3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration)
The following tables list the prerequisite hardware and storage system settings for using Business
Continuity Manager in a 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration.
Table 53 Prerequisite hardware (3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration)
Remarks
Description
Item
--
One host must be installed at each site.
Host
Only one storage system is allowed for
each site.
One XP P9500 disk array or XP7 storage must be installed at
each site (three storage systems are required in total).
Storage system
Physical paths between the sites must
always be established.
Bidirectional physical path connected between appropriately
configured fibre channel ports is required between the storage
systems at the following sites:
Link between storage
systems (physical
path)
•
Primary site and remote site 1
•
Primary site and remote site 2
•
Remote site 1 and remote site 2
Defining a 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration 189