Preparing the hardware (cnt ac-j z attime suspend) – HP XP Racks User Manual
Page 285
![background image](/manuals/398324/285/background.png)
Figure 106 Example of a Configuration for Using the Cnt Ac-J Z ATTIME Suspend Function
Preparing the hardware (Cnt Ac-J Z ATTIME Suspend)
lists the prerequisite hardware and
lists the hardware
settings for using Business Continuity Manager in the Cnt Ac-J Z ATTIME suspend function.
Table 88 Prerequisite Hardware (Cnt Ac-J Z ATTIME Suspend)
Remarks
Description
Item
–
Install a host machine at the primary site. If copy
group operations need to be performed from the
Host
secondary site, also install a host machine at that
site.
The maximum number of storage systems for each site
depends on the storage systems. Configuration
Primary site: one or more XP12000/XP10000,
XP24000/XP20000, XP P9500 disk arrays, or
XP7 storage.
Storage system
limitations may exist. Consult your HP Representative
Secondary site: one or more XP12000/XP10000,
XP24000/XP20000, XP P9500 disk arrays, or
XP7 storage.
for detailed information about the availability of specific
features for the array models being used.
–
Establish a bidirectional physical path using
appropriately configured fiber channel ports
between the primary site and the secondary site.
Link between storage
systems (physical path)
Defining a configuration so that the Cnt Ac-J Z ATTIME Suspend function can be used 285