Failback – HP XP Racks User Manual
Page 457
![background image](/manuals/398324/457/background.png)
•
YKQUERY
•
YKRESYNC DELTAJNL
•
YKEWAIT GOTO(DUPLEX)
After the commands finish successfully, the Cnt Ac-J Z copy pairs between the primary storage
system and the remote storage system are automatically moved to the HOLD status.
5.
Start primary storage system maintenance.
Operation in a 2DC configuration is performed on the local storage system.
Failback
To perform a failback:
1.
Finish the primary storage system maintenance.
2.
Use TPC-R on the primary host to restart the copying of the Cnt Ac-S copy pairs with the
HyperSwap attribute.
Cnt Ac-S copy pairs with the HyperSwap attribute are moved from the SWAPPING status to
the DUPLEX status.
Using a 2DC configuration with HyperSwap and Continuous Access Journal Z 457
This manual is related to the following products: