beautypg.com

HP XP Performance Advisor Software User Manual

Page 65

background image

8.

Select the Stagger Collection check box if you want to stagger the data collection time at
different intervals.

For example, if the Stagger Collection check box is not selected, and Frequency is set to 15
minutes, performance data collection occurs every fifteen minutes, irrespective of when the
schedule is created. For example, if the schedule is created at 10.12 a.m., the first collection
occurs immediately and the next collection occurs at the quarter of the hour, which is 10.15
a.m. The subsequent collections occur at 10.30 a.m., 10.45 a.m., and so on. If you select
Stagger Collection, performance data collection occurs every 15 minutes from the time the
schedule is created. For example, if the schedule is created at 10.12 a.m., the first collection
occurs immediately, and the next collection is 15 minutes later, at 10.27 a.m. The subsequent
collections take place every 15 minutes after that.

The

Stagger Collection ensures that the load on the management server is balanced, because

the

data collection occurs for all the XP and the XP7 disk arrays at varied points of time in

the

day and not for every 15 minutes in an hour.

9.

Select the Add new RGs and Ports to the schedules that have RG and Port components enabled
check box if you want to update the new RAID groups or port components that are discovered
during the scheduled performance data collection to the appropriate schedule. The newly
discovered components are added to the appropriate schedule without impacting the other
components included in a performance data collection schedule.

10. Click Save for the changes to take effect.

Click Cancel, if you do not want to configure a schedule for the current selection.

Click

Refresh to view the updated list of performance data schedules.

The

new schedule starts automatically. The following table provides the subsequent changes

that

occur in the Performance Data section for the selected XP/XP7 disk array record.

Description

Screen elements

Displays the new schedule name.

Schedule Name

Displays the selected components. Click View to see the
corresponding schedule details.

Components

Displays

, which indicates that the schedule has started.

Enabled

Initially, displays

when a schedule is not yet configured

or stopped.

Displays the selected frequency for the DKC, RAID groups,
and the port data collection.

Frequency

Initially, displays 0,0,0 when a schedule is not yet
configured.

When the performance data collection is in progress, you can perform the following functions.
Allow HP XP7 Performance Advisor to complete at least two performance data collection cycles
before you proceed with the following tasks. This is to ensure that sufficient data is available that
can be projected on the respective screens:

View a graphical representation of the performance of components for different metrics and
duration that you specify. For more information, see

“Plotting charts” (page 234)

.

View the performance summary of components on the Array View screen. For more information,
see

“Viewing performance summary” (page 177)

.

Configure alarms on components, so that HP XP7 Performance Advisor can send appropriate
alarm notifications. For more information, see

“Adding or removing metric values” (page 119)

.

Collecting performance data

65