3 installing the hbp-2x beltpacks, Power up, Installing the hbp-2x beltpacks – Clear-Com HLI-FBS User Manual
Page 35
Power up
There is no power switch, button or key on the HMS-4X Main Station. To power up the main station:
1. Connect the power cord [ ] to the power supply connector [ ] on the main station.
Use the cable retaining clip on the main station to secure the power cord. The retaining clip is
detached for shipping and must be refitted.
Note:
For the location of the power supply connector on the main station, see
A
in
Table 12: Key to HMS-4X Main Station rear panel diagram.
2. Connect the power cord to the power source (socket). The main station requires an input voltage
between 100 - 240 VAC / 50-60Hz/
250 watts / T 3.15A H 250 V.
During power up (which takes 15-20 seconds), the front panel display screens momentarily display the
Clear-Com logo [ ] until the device is ready for operation.
Only connect power supply to earthed supply sockets. Ensure that the power supply is
routed to avoid sharp bends, hot surfaces, pinches and abrasion.
For safety guidance, see the Safety Instructions at the front of this guide.
3.2.3 Installing the HBP-2X Beltpacks
The HBP-2X Beltpack is a device that you can:
• Wear at your belt, using either the beltclip or beltloops.
• Install to a shelf or other flat surface.
• Attach to a pole or other fixed upright position.
Tip:
For more information, see 2.3.3 HBP-2X beltclip, beltloops and feet (base view)
Power up
The HBP-2X Beltpack is powered from the (standard mic) cable that connects the device with the HMS-
4X Main Station (see below).
33
HelixNet Partyline User Guide