Executing a test run
If the central tool file is active, a tool table must be active (status S) to

conduct a test run. Select a tool table via the file manager (PGM MGT)

in the Test Run mode of operation
With the MOD function BLANK IN WORK SPACE, you can activate

work space monitoring for the test run (see "Showing the workpiece

blank in the working space", page 581).

Select the Test Run operating mode

Call the file manager with the PGM MGT key and

select the file you wish to test, or

Go to the program beginning: Select line 0 with the

GOTO key and confirm your entry with the ENT key

The TNC then displays the following soft keys:

You can interrupt the test run and continue it again at any point—even

within a fixed cycle. In order to continue the test, the following actions

must not be performed:

Selecting another block with the arrow keys or the GOTO key

Making changes to the program

Switching the operating mode

Selecting a new program

Functions

Soft key

Reset the blank form and test the entire program

Test the entire program

Test each program block individually

Halt test run (soft key only appears once you have

started the test run)