System installation, About this chapter, Hardware installation – AMETEK CTS 3.0 User Manual
Page 32
Compliance Test System 3.0
User Manual
28
3.
System Installation
3.1
About This Chapter
This chapter provides information on system installation and covers both the hardware
connections that need to be made between the various components and the software setup.
Proper installation of all hardware components and software modules is required to successfully
use the CTS system. Some experience with AC power systems and PC‟s running Windows is
assumed.
3.2 Hardware Installation
3.2.1
Unpacking
Inspect the unit for any possible shipping damage immediately upon receipt. If damage is evident,
notify the carrier. DO NOT return an instrument to the factory without prior approval. Do not
destroy the packing container until the unit has been inspected for damage in shipment.
3.2.2
AC
Source
Refer to the User Manual provided with the AC Source.
The main power requirements for the CTS are dictated by the AC power sources used and the
power levels that the Equipment Under Test will demand. Consult the AC Power source manual
for input current and input wiring requirements.