Installing new cts 3.0 calibration data – AMETEK CTS 3.0 User Manual
Page 156
Compliance Test System 3.0
User Manual
152
17.6
Installing New CTS 3.0 Calibration Data
If you have send in the CTS 3.0 system for calibration at a remote calibration lab or at California
Instruments, the PC normally used to run the CTS system will typically not have the new calibration
on it when you receive the PACS and A/D card back. The new calibration data will be received on a
removable medium such as a CD ROM or floppy disk or emailed to you as an alternative.
To install the new calibration data, proceed as follows:
1. Insert the calibration disk received into CD ROM or floppy drive as appropriate.
2. Open your Windows Explorer and select the drive.
3.
Copy the CTS_Calibration.cts file located on the removable medium‟s root directory
4. Paste this file to the C:\ root of the PC that operates the CTS system.
5. Run the CTS 3.0 program. Upon launch, the CTS 3.0 program will detect the calibration data
file which should have a newer date and time stamp that the calibration data currently in use. If
so, the program will automatically read the new cal file and update its calibration data base.
6. You can verify that the new calibration data has been loaded by selecting the "View, Calibration
Info" menu.
You can save the calibration disk if needed although annual re-calibration of the system is
recommended.