Iec 61000-4-29 test reports – AMETEK CTS 3.0 User Manual

Page 136

background image

Compliance Test System 3.0

User Manual

132

As a general rule, the test result is positive if the equipment shows its immunity, for
the duration of the application of the test, and at the end of the tests the EUT fulfills
the�functional�requirements�established�in�the�technical�specification.”

The user has to make this determination by observing the unit under test. At the end of the test,
the GUI will pop up a dialog box asking the operator to assess the state of the EUT. If the EUT is
still functional, the operator may answer Yes when prompted. If not, he should answer no. The
response to this query is incorporated as a PASS or FAIL result in the test report.

13.7

IEC 61000-4-29 Test Reports

At the end of a test run, the operator can generate a test report by clicking on the “Print report”
button. IEC 61000-4-29 test reports include all test setup information and test results. User
provided information at the bottom of the 4-29 screen is included as well.

The report format and test report headers can be selected from the Option, IEC Test Report
menu but needs to be done before opening the IEC 429 test screen. The selected format (Printer,
Text File or MS Word) applies to all IEC immunity tests. MS Word reports are automatically saved
in the C:\Program Files\California Instruments\Cigui32\Reports or C:\Program Files\California
Instruments\CiguiSII\Reports directory.