Enabling the zero shift, Canceling the zero shift (reset), 5*khv – KEYENCE IL Series User Manual
Page 51: Tgugv, Il-e
3-5 Zero Shift Function (Shifting the Internal Measurement Value (R.V.))
3-19
IL-E
3
Basic Oper
ations
When the following operation is performed on the main screen, the zero shift indicator
[ZERO SHIFT] lights up for approx. 0.5 second and the current internal measurement value
(R.V.) shifts to the shift target value.
• Press the zero shift button [ZERO SHIFT] (within 1 second).
• Turn ON the zero shift input of external input for 20 ms or more.
When the following operation is performed on the main screen, the zero shift is canceled
and the internal measurement value (R.V.) returns to the previous state (initial state) before
the zero shift function is used.
• Press the zero shift button [ZERO SHIFT] for 2 seconds or more.
The following screen appears after operation.
Enabling the Zero Shift
Point
• When the zero shift from the external input is performed, if the
power is turned OFF, the previous state before the zero shift
function is restored. If you wish to keep the shifted state of the
internal measurement value (R.V.) even after the power is turned
OFF, set the zero shift value memory function to ON.
"13. Zero Shift Value Memory Function" (page 4-38)
• When the internal measurement value (R.V.) is [-----],
and
“3.AVE” is [HPF], the zero shift function cannot be used. After
the screen below is displayed, it will be automatically returned
to the main screen.
Reference
When the zero shift is performed by pressing the zero shift button, the
shifted state of the internal measurement value (R.V.) is preserved even
after the power is turned off.
'TT
LASER
BANK
0
1
2
3
HI
GO
LO
R.V.
ANALOG
HI
SHIFT
ZERO SHIFT
TIMING
LO
ALIGNMENT
5*KHV
HOLD
CALC
CHECK
Canceling the Zero Shift (Reset)
TGUGV
LASER
BANK
0
1
2
3
HI
GO
LO
R.V.
ANALOG
HI
SHIFT
ZERO SHIFT
TIMING
LO
ALIGNMENT
5*KHV
HOLD
CALC
CHECK