Metrohm 796 Titroprocessor User Manual
Page 122
7.8 MEAS
Extended measuring functions
796 Titroprocessor, Instructions for use
116
116
Time
Drift
Waiting period
Measurement drift
mV
Min
Sampling time
7.8.3 Multiple measurement
A multiple measurement consists of a series of drift or time-controlled indi-
vidual measurements. For the measurement acceptance of the individual
measurements the same parameters as for the above-mentioned standard
measurements are decisive. Each entry in the measuring point list is a
'smoothed' value.
The data recording parameters determine the measuring series run. The
number of measurement cycles and the measuring interval determine the
time taken for the series of measurements. The measuring interval defines
the time pattern at which the individual measurements are triggered. De-
pending on the type of measurement acceptance and the stability of the
measuring signal the time at which the measurement is entered into the
measuring point list may differ from the time pattern.
It is very important that the waiting period for the measurement acceptance
is selected to be shorter than the measuring interval, i.e. the waiting period
for the individual measurements should have safely elapsed when the next
measurement (according to the measuring interval) is started.
Time
Measured
value
Measuring interval
Tim
e
Drift
Measurement drift
mV
Min
Waiting period
Drift-controlled
measuring phase
Measurement
acceptance in
measuring
point list
Measuring interval
The various parameters of the MEAS modes are described in detail
on pages 171 to 177.
Time measurement is accepted
(if measurement drift or waiting
period has been fulfilled)
CM
= smoothed' measurement
Last entry in measuring
point list =
CM
First entry in
measuring point list
=
IM