SATEC PM180 Operation Manual User Manual
Page 137

Chapter 14 Viewing Log Files
Viewing the IEEE 1159 Statistics Report
PM180 Substation Automation Unit
135
Changing the Report Time Range and Contents
Click on the report with the right mouse button, select “Options…”, select the required
time range, check the voltage characteristics to be included in the report, and then
click OK.
See also other documents in the category SATEC Equipment:
- AX-8 (15 pages)
- BFM136 (70 pages)
- C191HM (63 pages)
- C192PF8-RPR (75 pages)
- EDL175 (23 pages)
- EM132-133 Manual (152 pages)
- EM132-133 Quick Start (10 pages)
- ETC2002 (57 pages)
- EM720 Installation Manual (32 pages)
- EM720 Operation Manual (218 pages)
- EM920 Installation Manual (37 pages)
- EM920 Operation Manual (225 pages)
- SA300 ezPAC Installation Manual (43 pages)
- SA300 ezPAC Operation Manual (182 pages)
- PAS (27 pages)
- PM130 PLUS Manual (159 pages)
- PM130 PLUS Quick Start (4 pages)
- PM135 Manual (166 pages)
- PM135 Quick Start (4 pages)
- RDM172 Manual (135 pages)
- RDM172 Quick Start-1 (10 pages)
- RDM172 Quick Start-2 (14 pages)
- PM174 Manual (149 pages)
- PM174 Quick Start (11 pages)
- PM175 Manual (168 pages)
- PTS175 Manual (12 pages)
- PM175 Quick Start (13 pages)
- PM180 Installation Manual (33 pages)
- RGM180 (24 pages)
- PM296 (77 pages)
- RSC232 (10 pages)
- 1771DB (17 pages)
- SLC500 (24 pages)