4. Commissioning

4−12

Festo P.BE−SPC200−COM−CANDN−EN en 0511a

6. Select the register card Field bus I/O".

Fig. 4/5:

I/O assignments

7. Undertake the desired I/O assignments (Mapping).

For an explanation of the mappings seeĂalso Fig. 1/5.

8. Confirm the settings with OK.

The settings will be transmitted to the SPC200 when the
project is loaded and will then become valid.

Please note
Part download: If you click on Download" in a dialogue
window (e.g. in the window SPC200 configuration"), only
the settings of the currently open register will be transĆ
mitted.

·

Select [Online] [Download] [Project]ā, if you wish to
transmit

all the parameters.