Create readiness to operate – Festo Кабели и принадлежности User Manual
Page 111
A. Technical appendix
A−23
Festo P.BE−SPC200−COM−CANDN−EN en 0511a
Create readiness to operate
When you switch on the operating and load voltages, you
must observe the waiting times specified.
Wait
ţ 10 s
Set ENABLE
Initialization and
self test
Switch on the operating
voltage and load voltage at
the same time
Set ENABLE
Switch on the load voltage
Wait
ţ 1 s
Start: Create readiness to
operate
Wait
ţ 10 s
Reset ENABLE
Switch on the operating
voltage
1
Switch on
power supply
at same
time?
Yes
No
1
2
2
2
1
Operating and load voltage supplies of the SPC200
2
The voltage must in each case be stable at 24 V DC −5 %/+25 %
Fig. A/1:
Create readiness to operate
This manual is related to the following products: