Festo Кабели и принадлежности User Manual
Page 44
4. Commissioning
4−6
Festo P.BE−SPC200−COM−CANDN−EN en 0511a
In order to generate control signals in the test mode:
1. Activate the command [Online] [Observe] [Field bus
module] [Control signals/Record number].
2. Activate the test mode, e.g. with function key F5.
1
2
3
1
ENABLE signal
2
Stop signal
3
Display for test mode
Fig. 4/1:
Control signals for commissioning (example)
The contents of the window [Control signals] depends on the
operating mode set. The mark ĩ next to the control signal
shows that the relevant input/output supplies a 1−signal.
Tab. 4/1 shows an overview of the control signals.
On the next page you will find an example of a function test
with Record Select.
This manual is related to the following products: