beautypg.com

Festo Кабели и принадлежности User Manual

Page 44

background image

4. Commissioning

4−6

Festo P.BE−SPC200−COM−CANDN−EN en 0511a

In order to generate control signals in the test mode:

1. Activate the command [Online] [Observe] [Field bus

module] [Control signals/Record number].

2. Activate the test mode, e.g. with function key F5.

1

2

3

1

ENABLE signal

2

Stop signal

3

Display for test mode

Fig. 4/1:

Control signals for commissioning (example)

The contents of the window [Control signals] depends on the
operating mode set. The mark ĩ next to the control signal
shows that the relevant input/output supplies a 1−signal.

Tab. 4/1 shows an overview of the control signals.
On the next page you will find an example of a function test
with Record Select.

This manual is related to the following products: