Festo Кабели и принадлежности User Manual
Page 41
4. Commissioning
4−3
Festo P.BE−SPC200−COM−CANDN−EN en 0511a
Overview of commissioning
Warning
Injury to people and damage to property
Make sure that nobody can place his/her hand in the
positioning range of the moveable mass and that there are
no objects in its path.
Procedure:
1. Read completely through this chapter and the corresponĆ
ding chapters in the WinPISA manual.
2. Create and save the hardware configuration of the
SPC200 with the aid of WinPISA.
} Section 4.1.1
3. Commission the individual axes with the aid of WinPISA
(without using the field bus interface). See the system
manual for the SPC200.
4. Set the field bus configuration of the SPC200 with
WinPISA (field bus address, baud rate etc.).
} Section 4.1.2
5. Configure the scanner and the network with suitable
configuration software (e.g. with RSNetWorx).
} Section 4.2
6. Test the field bus connection.