beautypg.com

HP Insight Control User Manual

Page 73

background image

If you establish the source-to-destination or application-station-to-destination connection and the network
test reports a transfer speed of at least 250 kb/s, the Next button is enabled.

CAUTION:

If the application-station-to-destination latency is less than 125 milliseconds, continue with

the migration. Latency greater than 125 milliseconds might cause driver injection issues.

9.

Click Next.

10. Select the post-migration tasks, and then click Next.

Select whether the Insight Control application must perform disk-error checks on the source server
before migration. By default, theUse CHKDSK to detect and fix errors on all source disks
prior to migration

checkbox is selected.

NOTE:

A reboot or shutdown option is not available for the destination virtual machine for X2V

migrations when the option to manually create and the boot the destination virtual machine is
selected instep 3 of the Migration Wizard. After the migration is completed, manually reboot the
destination virtual machine.

Select whether the destination virtual machine should be rebooted or shut down.

Physical-to-virtual (P2V) migrations for Windows

73