beautypg.com

Stake road – screen three – Spectra Precision Survey Pro v3.80 Recon iPAQ Reference Manual User Manual

Page 231

background image

Roads Menu

R-225

Stake Road – Screen Three

The third Stake Road screen displays distance, direction, and other
information about the point to be staked.

Station

: displays the station where the stake point occurs

and the type of line segment it falls on in the alignment.

Segment

: displays the name of the segment tangent to

the point to be staked; if the point is on the

Left

or

Right

side of the road; and the specified offset, if any.

Angle

Right

: is the horizontal angle from the backsight

to the stake point.

Horz

Dist

: is the horizontal distance from the total

station to the stake point.

Vert

Dist

: is the vertical distance from the total station to

the stake point.

ZE

to

Rod

: is the zenith angle from the total station to

the stake point.

&LUFOH =HUR : is used to modify the circle on the total station so that

the angle right reading will be zero when it is facing toward the
design point, which can sometimes be easier than turning to an
obscure angle value. When this button is tapped, the following
actions will occur:

1.

A new backsight circle value is computed, sent to the instrument
and stored in the raw data

2.

The

Angle Right

value is changed to zero to reflect the change. The

instrument now needs to be turned horizontally to zero to face the
design point.

3.

To prevent errors, the backsight set up is invalidated when
exiting the Stakeout dialog if this button has been used. A Circle
zeroed on a design point is meaningless once the design point has
been staked.