Stake line and offset – screen three – Spectra Precision Survey Pro v3.80 Recon iPAQ Reference Manual User Manual
Page 141
Stakeout Menu
R-135
*UDGH specifies a slope from the specified line to the parallel line
that is being staked. When this is a non-zero value, the elevation for
the staked points will increasingly differ from the design elevations
as the
Offset
value increases.
Height of rod
: is the length of the rod.
%DFNVLJKW« : accesses the Backsight Setup screen.
%DFN : returns to the previous screen.
6ROYH! : accesses the third Stake Line and Offset screen, described
next.
Note: A motorized total station will automatically turn toward the
design point after pressing
6ROYH! depending on the configuration of
the Stakeout Settings screen (Page R-35).
Stake Line and Offset – Screen Three
Station
: displays the current station that is being staked.
H. Offset
: displays the offset distance of the line being
staked from the specified line and if it is on the
R
ight or
L
eft side of the specified line.
From Gun to Design Point
: displays the direction and
distance that the total station must aim toward so that it
is facing the current station.
&LUFOH =HUR : is used to modify the circle on the total
station so that the angle right reading will be zero when
it is facing the current target, which can sometimes be
easier than turning to an obscure angle value. When
this button is tapped, the following actions will occur:
1.
A new backsight circle value is computed, sent to
the instrument and stored in the raw data
2.
The
Angle Right
value is changed to zero to reflect the change.
The instrument now needs to be turned horizontally to zero to
face the current target location.