Requirements for Industrial Robots under Ordinance on Industrial Safety and

Health

Work area

Work condition

Cutoff of drive

source

Measure

Article

Signs for starting operation

Article 104

Outside

movement

range

During

automatic

operation

Not cut off

Installation of railings, enclosures,

etc.

Article 150-4

Cut off

(including stopping

of operation)

Sign, etc., indicating that work is in

progress

Article 150-3

Preparation of work rules

Article 150-3

Measures to enable immediate

stopping of operation

Article 150-3

Sign, etc., indicating that work is in

progress

Article 150-3

Provision of special education

Article 36-31

During

teaching, etc.

Not cut off

Checkup, etc., before

commencement of work

Article 151

To be performed after stopping the

operation

Article 150-5

Cut off

Sign, etc., indicating that work is in

progress

Article 150-5

Preparation of work rules

Article 150-5

Measures to enable immediate

stopping of operation

Article 150-5

Sign, etc., indicating that work is in

progress

Article 150-5

Inside

movement

range

During

inspection, etc. Not cut off (when

inspection, etc.,

must be performed

during operation)

Provision of special education

(excluding cleaning and lubrication)

Article 36-32

No.

Operation

Description

Description

2

Transportation Ɣ When carrying a heavy object, do the work with two or more persons or

utilize equipment such as crane.

Ɣ When the work is carried out with 2 or more persons, make it clear who is

to be the leader and who to be the follower(s) and communicate well with

each other to ensure the safety of the workers.

Ɣ When in transportation, consider well about the positions to hold, weight

and weight balance and pay special attention to the carried object so it

would not get hit or dropped.

Ɣ Transport it using an appropriate transportation measure.

The actuators available for transportation with a crane have eyebolts

attached or there are tapped holes to attach bolts. Follow the instructions

in the instruction manual for each model.

Ɣ Do not step or sit on the package.

Ɣ Do not put any heavy thing that can deform the package, on it.

Ɣ When using a crane capable of 1t or more of weight, have an operator

who has qualifications for crane operation and sling work.

Ɣ When using a crane or equivalent equipments, make sure not to hang a

load that weighs more than the equipment’s capability limit.

Ɣ Use a hook that is suitable for the load. Consider the safety factor of the

hook in such factors as shear strength.

Ɣ Do not get on the load that is hung on a crane.

Ɣ Do not leave a load hung up with a crane.

Ɣ Do not stand under the load that is hung up with a crane.

3

Storage and

Preservation

Ɣ The storage and preservation environment conforms to the installation

environment. However, especially give consideration to the prevention of

condensation.

Ɣ Store the products with a consideration not to fall them over or drop due to

an act of God such as earthquake.

4

Installation

and Start

(1) Installation of Robot Main Body and Controller, etc.

Ɣ Make sure to securely hold and fix the product (including the work part). A

fall, drop or abnormal motion of the product may cause a damage or injury.

Also, be equipped for a fall-over or drop due to an act of God such as

earthquake.

Ɣ Do not get on or put anything on the product. Failure to do so may cause

an accidental fall, injury or damage to the product due to a drop of

anything, malfunction of the product, performance degradation, or

shortening of its life.

Ɣ When using the product in any of the places specified below, provide a

sufficient shield.

1) Location where electric noise is generated

2) Location where high electrical or magnetic field is present

3) Location with the mains or power lines passing nearby

4) Location where the product may come in contact with water, oil or

chemical droplets