Chapter 2: installation, Unpacking the qc-300 – HEIDENHAIN ND 1300 VED and Crosshair Systems User Manual
Page 25
2
Installation
Chapter 2:
Installation
The QC-300 is easy to install in a variety of basic and advanced measurement applications. This chapter
describes how to unpack and install the QC-300. Repackaging instructions are also included for return
shipments and for distributors and OEM customers that are configuring a QC-300 and shipping it to an
end-user.
Unpacking the QC-300
Carefully remove the contents of the shipping carton.
NOTE
Save the carton and packaging materials in case future reshipment becomes neces-
sary.
Inspect the components listed below for shipping damage. The contents of the carton includes:
• QC-300 instrument • Mounting stand and hardware
• Power cord • Warranty registration card
Shipments of other optional equipment in separate cartons might include:
• RS-232 serial cable • Video cable
• Light control cable • CNC output cable
• Foot switch • Taltech’s WinWedge
®
software
If any components were damaged in shipment, save the packaging materials for inspection and contact
your shipping agent for mediation. Contact your Metronics distributor for replacement parts.