beautypg.com

Rack mounting procedure, Rack mounting procedure -6, Danger – Carrier Access Broadmore 1750 User Manual

Page 78: Warning

background image

4-6

Broadmore 1750 - Release 4.6

Chassis Installation and Grounding

Rack Mounting Procedure

Rack Mounting Procedure

Rack-mounting the Broadmore 1750 chassis requires:

two technicians

clear access to front and rear of rack

user-provided rack mounting hardware (screws)

DANGER!

E

XERCISE

NORMAL

PRECAUTIONS

FOR

LIFTING

HEAVY

OBJECTS

. U

SE

TWO

PEOPLE

TO

LIFT

THE

B

ROADMORE

1750. W

HEN

LIFTING

,

SUPPORT

IT

FROM

THE

BOTTOM

AND

TAKE

CARE

TO

AVOID

SHARP

EDGES

OR

CORNERS

.

WARNING!

T

HE

FRONT

AND

REAR

COVERS

OF

THE

CHASSIS

MUST

REMAIN

ATTACHED

TO

PREVENT

THE

CHASSIS

FROM

BENDING

DURING

THE

RACK

-

MOUNTING

PROCEDURE

.

Perform the following steps:

1. Ensure that the front and rear chassis covers are firmly attached to provide

mechanical support and prevent accidental damage.

2. Carefully lift the Broadmore 1750 and position it in the desired rack location.

One technician should support the rear and the second should support the front.

3. Ensure that there is a 1.75 inch space above the chassis for adequate air flow.

4. Insert screws through the chassis and rack mounting holes. Every bracket hole

must have a screw securely installed to ensure proper weight distribution and
support.