beautypg.com

10 start sequence – AERCO BMK 2000DF User Manual

Page 48

background image

Benchmark 1500DF - 2000DF Boilers

CHAPTER 3 – OPERATION

Page 48 of 196

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0098_0A

04/01/2014

Ph.: 800-526-0288

GF-144

Menu Item Display

Available Choices or Limits

Default

Minimum

Maximum

Err Threshold

1

9

5

SSD Temp Format

Degrees

Points

Degrees

BST Upld Timer

0

9999 sec

0

3.10 START SEQUENCE

When the Control Box ON/OFF switch is set to the ON position, it checks all pre-purge safety

switches to ensure they are closed. These switches include:

Safety Shut-Off Valve (SSOV) Proof of Closure (POC) switch

Low Water Level switch

High Water Temperature switch

High Gas Pressure switch

Low Gas Pressure switch

Blower Proof switch

Blocked Inlet switch

If all of the above switches are closed, the READY light above the ON/OFF switch will light and

the unit will be in the Standby mode.
When there is a demand for heat, the following events will occur:

NOTE

If any of the Pre-Purge safety device switches are open, the

appropriate fault message will be displayed. Also, the appropriate

messages will be displayed throughout the start sequence, if the

required conditions are not observed.

1.

The DEMAND LED status indicator will light.

2.

The unit checks to ensure that the Proof of Closure (POC) switches in the downstream

Safety Shut-Off Valve (SSOV) are closed. See Figure 3-3 for SSOV locations.

This manual is related to the following products: