beautypg.com

2 emergency shutdown, 3 prolonged shutdown – AERCO BMK 2000DF User Manual

Page 12

background image

Benchmark 1500DF - 2000DF Boilers

CHAPTER 1 – SAFETY PRECAUTIONS

Page 12 of 196

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0098_0A

04/01/2014

Ph.: 800-526-0288

GF-144

A THREE-POLE SWITCH MUST BE INSTALLED ON THE ELECTRICAL

SUPPLY LINE OF THE UNIT. THE SWITCH MUST BE INSTALLED IN AN

EASILY ACCESSIBLE POSITION TO QUICKLY AND SAFELY

DISCONNECT ELECTRICAL SERVICE. DO NOT AFFIX SWITCH TO

UNIT SHEET METAL ENCLOSURES.

Many soaps used for gas pipe leak testing are corrosive to metals. The

piping must be rinsed thoroughly with clean water after leak checks have

been completed.

DO NOT use this boiler if any part has been under water. Call a qualified

service technician to inspect and replace any part that has been under

water.

1.2 EMERGENCY SHUTDOWN

If overheating occurs or the gas supply fails to shut off, close the manual gas shutoff valve

(Figure 1-1) located external to the unit.

NOTE

The Installer must identify and indicate the location of the

emergency shutdown manual gas valve to operating personnel.

Figure

1-1: Manual Gas Shutoff Valve

1.3 PROLONGED SHUTDOWN

After prolonged shutdown, it is recommended that the startup procedures in Chapter 4 and the

safety device test procedures in Chapter 6 of this manual be performed, to verify all system-

WARNING

CAUTION

CAUTION

VALVE OPEN

VALVE CLOSED

MANUAL GAS SHUT-OFF VALVE

This manual is related to the following products: