2.4 SITE PREPARATION

Ensure that the site selected for installation of the Benchmark 1500/2000 Boiler includes:

Access to AC Input Power at 120 VAC, Single-Phase, 60 Hz @ 20 Amps

Access to Natural Gas line at a minimum pressure of 8 inches W.C. at gas flow for

1,500,000 BTU/hr energy input for the BMK 1500 OR 2,000,000 BTU/hr energy input for

the BMK 2000.

2.4.1 Installation Clearances

The Benchmark Model 1500 and 2000 are packaged in an enclosure having identical exterior

dimensions. The unit must be installed with the prescribed clearances for service as shown in

Figure 2-1a. The minimum clearance dimensions, required by AERCO, are listed below.

However, if Local Building Codes require additional clearances, these codes shall supersede

AERCO’s requirements. Minimum acceptable clearances required are as follows:

Sides: 24 inches

Front : 24 inches

Rear: 24 inches

Top: 18 inches

All gas piping, water piping and electrical conduit or cable must be arranged so that they do not

interfere with the removal of any panels, or inhibit service or maintenance of the unit.

Figure 2-1a: Benchmark Boiler Model 1500/2000 Clearances

NOTE

Ensure that

condensate

assembly is not

located over the

housekeeping

pad.