Benchmark 1500DF - 2000DF Boilers
CHAPTER 2 – INSTALLATION
OMM-0098_0A
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Page 17 of 196
GF-144
Ph.: 800-526-0288
04/01/2014
KEEP THE UNIT AREA CLEAR AND FREE FROM ALL COMBUSTIBLE
MATERIALS AND FLAMMABLE VAPORS OR LIQUIDS
.
While packaged in the shipping container, the unit must be moved by pallet
jack or forklift from the FRONT ONLY.
FOR MASSACHUSSETTS ONLY:
For Massachusetts installations, the unit must be installed by a plumber or
gas-fitter licensed within the Commonwealth of Massachusetts. In addition,
the installation must comply with all requirements specified in Chapter 1
(Safety Precautions), pages 11 and 12.
2.4.2 Setting the Unit
The unit must be installed on a 4 to 8 inch thick concrete housekeeping pad to ensure proper
condensate drainage. If anchoring the unit, refer to Figure 2-1b for anchor locations.
Figure 2-1b: Benchmark 1500/2000 Anchor Bolt Locations
A total of 3 lifting lugs are provided at the top of the primary heat exchanger as shown in Figure
2-2. Remove the front top panel from the unit to provide access to the lifting tabs.
Remove the four (4) lag screws securing the unit to the shipping skid. Lift the unit off the
shipping skid and position it on the 4 to 6 inch concrete housekeeping pad (required) in the
desired location.
WHEN LIFTING OR MOVING THE BOILER, DO NOT ATTEMPT
TO MANIPULATE THE BOILER USING THE GAS TRAIN OR
BLOWER.
WARNING
CAUTION
WARNING