KEEP THE UNIT AREA CLEAR AND FREE FROM ALL COMBUSTIBLE

MATERIALS AND FLAMMABLE VAPORS OR LIQUIDS

.

While packaged in the shipping container, the unit must be moved by pallet

jack or forklift from the FRONT ONLY.

FOR MASSACHUSSETTS ONLY:

For Massachusetts installations, the unit must be installed by a plumber or

gas-fitter licensed within the Commonwealth of Massachusetts. In addition,

the installation must comply with all requirements specified in Chapter 1

(Safety Precautions), pages 11 and 12.

2.4.2 Setting the Unit

The unit must be installed on a 4 to 8 inch thick concrete housekeeping pad to ensure proper

condensate drainage. If anchoring the unit, refer to Figure 2-1b for anchor locations.

Figure 2-1b: Benchmark 1500/2000 Anchor Bolt Locations

A total of 3 lifting lugs are provided at the top of the primary heat exchanger as shown in Figure

2-2. Remove the front top panel from the unit to provide access to the lifting tabs.
Remove the four (4) lag screws securing the unit to the shipping skid. Lift the unit off the

shipping skid and position it on the 4 to 6 inch concrete housekeeping pad (required) in the

desired location.

WHEN LIFTING OR MOVING THE BOILER, DO NOT ATTEMPT

TO MANIPULATE THE BOILER USING THE GAS TRAIN OR

BLOWER.

WARNING

CAUTION

WARNING