Rockwell Automation FactoryTalk Report Expert User Guide User Manual
Page 128

Chapter 8 Editing Event and Production Data
128
Rockwell Automation Publication RPTEXP-UM001H-EN-P-June 2014
• The Summarization Criteria of the selected User-defined
summarization field is set to one of the following in the
Configuration Console:
• Specify a default Summarization Criteria Value for this
Plant Model Activity Area.
• Specify an Unscheduled Data Point to provide
Summarization Criteria information for this Plant Model
Activity Area.
• Use a FactoryTalk Transaction Manager Expression to
provide Summarization Criteria information. This option
is available for flex fields configured as numeric and
boolean.
To edit the user-defined summarization field:
1. Select the Edit Production Data operation and the desired
parameter set.
2. In the Grouping parameter, select the user-defined
summarization field you want to display in the Production
data list panel.
3. Click View Data.
TIP
Alternatively, select the Enter Data Manually operation and
the desired parameter set. In the Grouping parameter, select
the user-defined summarization field you want to display in the
Production data list panel. Click View Data and make sure that
the Production option is selected.
The selected data is displayed in the Production data list.
4. Click Edit in the row in which you want to modify the ideal
cycle time.
The user-defined summarization field selected in the
Grouping parameter becomes editable.
5. Complete or modify the user-defined field.
6. Click Save to save the modified data.