8 i/o signal timing – IAI America PCON-CFA User Manual

Page 73

background image

3.

ACON-C/CG, PCON-C/CG

CC-Link

67

3.8 I/O Signal Timing

When any of the control signal is turned ON to perform the operation of the robot cylinder using the PLC's
sequence program, the response (status) is returned to the PLC. The maximum response time is expressed
using the following formula.

Max. Response Time (msec) = Yt + Xt + 2 + Command Processing Time (Operation Time, etc.)
Yt: Master Station to Remote I/O Station Transmission Delay Time

Filed Network Transmission Delay Time

Xt: Remote I/O Station to Master Station Transmission Delay Time

For the Master Station to Remote I/O Station Transmission Delay Time (Yt) and the Remote I/O Station to
Master Station Transmission Delay Time (Xt), refer to the instruction manuals for the CC-Link Master Unit and
mounted PLC.

PLC Sequence Program

Control Signal

Status Signal

Master Station to Remote Station

Transmission Delay Time (Yt)

Remote Station to Master Station

Transmission Delay Time (Xt)

Command Processing Time

ACON, PCON

Control Signal

Status Signal