Juniper Networks SRX 210 User Manual
Page 70
NOTE:
The SRX210 Services Gateway cannot be center-mounted in racks.
provides the list of tasks you need to perform before installing the
device.
Table 24: SRX210 Services Gateway Preinstallation Checklist for
Rack-Mount Installation
Additional Information
Task
“Site Preparation Checklist for the SRX210
Services Gateway” on page 37
Verify that the site meets the requirements.
“SRX210 Services Gateway Rack
Requirements” on page 40
Verify that the racks or cabinets meet the specific
requirements.
Place the rack or cabinet in its permanent location,
allowing adequate clearance for airflow and
maintenance, and secure it to the building structure.
“Unpacking the SRX210 Services Gateway”
on page 49
Remove the services gateway chassis from the
shipping carton.
Verify that you have the following parts available
in your rack-mounting kit for the SRX210 Services
Gateway:
•
Rack-mounting brackets
•
Mounting screws
•
Power supply adapter tray with screws
•
Adapter stopper bracket
Adjust the power supply adapter tray.
NOTE:
The rack-mounting kit is not shipped with the device and must be
ordered separately.
Related
Documentation
Clearance Requirements for Airflow and Hardware Maintenance of the SRX210 Services
Gateway on page 41
•
•
Unpacking the SRX210 Services Gateway on page 49
•
•
Preparing the SRX210 Services Gateway for Desk-Mount Installation on page 55
•
Preparing the SRX210 Services Gateway for Wall-Mount Installation on page 56
Copyright © 2013, Juniper Networks, Inc.
54
SRX210 Services Gateway Hardware Guide