3 creating a tenant, Create tenant, Displays the – FUJITSU ServerView Resource Orchestrator Cloud Edition V3.1.0 User Manual
Page 132: Status of process window, To check the status of tenant creation, Create tenant window, To create a new tenant, Point

Point
The list displays 10 tenants at one time. Click the
icon to display the next 10 tenants, or click the
icon to display the previous
10 tenants.
2.
To display the most recent information, click the
icon.
Point
Checking process status
When the Status of process button is clicked, the Status of process window is displayed as a separate window and the status of tenant
creation, modification, and deletion processes performed during the current login can be checked.
The items in the Status of process window are shown below.
Item
Explanation
Operation
Displays the performed operation. One of the following operations is
displayed:
-
Create
-
Modify
-
Delete
Status
Displays the process status. The displayed status is one of the following:
-
Completed
-
Running
-
Failed
Tenant name
Displays the name of the tenant targeted by the process
Start date
Displays the time and date when the process was requested
End date
Displays the time and date when the process was completed
Error message
If the process failed, displays the cause of the failure
11.3 Creating a Tenant
The Create Tenant window can be used to create a new tenant.
Perform the following steps to create a tenant:
1.
Click the Create tenant button on the Tenant List window.
The Create Tenant window is displayed.
- 120 -