beautypg.com

Hitachi TAGMASTORE MK-90RD011-25 User Manual

Page 209

background image

Hitachi Command Control Interface (CCI) User and Reference Guide

191

The horctakeover will suspend G2(CA-Jnl) automatically if horctakeover will return “Swap-
takeover” as exit code. In DC1 host failure, if APP1 want to wait until DC3 become the
suspend state, then they can verify “SSUS” state by using the pairevtwait command as shown
below.

L1

0

L2

1

0

2

SVOL

PVOL

PVOL

PSUS

SMPL

G1 (Sync)

G2(UR)

DC1

DC2

L3

DC3

2

1

SVOL

SSUS

SMPL

Pairevtwait –g G3 –FHORC 1

–ss ssus

–t

600

APP1

G3 (UR)

horctakeover –g G1

APP1

APP

Figure 4.15 Example for waiting “SSUS” on 3DC using TC/UR