beautypg.com

HP Anab EQ5 User Manual

Page 4

background image


EQ5 AC Drive Operations Manual

_______________________________________________________________________

TECO – Westinghouse Motor Company

Compliance with UL



Instructions on maintenance, inspection, and replacement:

Danger

• Wait a minimum of five minutes (30HP/CT, 40HP/VT or less) or ten minutes (40HP/CT, 50HP/VT or more)

after power has been turned off (open) before starting an inspection. (Also confirm that the charge lamp is
off and that DC voltage between terminals P (+) and N (-) does not exceed 25V.) Otherwise electrical
shock may result.

• Only authorized personnel should perform maintenance, inspection, and replacement operations.(Take off

metal jewelry such as watches and rings and use insulated tools.) Otherwise electric shock or injury
may result.

Instructions on disposal:

Caution

• Treat as industrial waste when disposing it. Otherwise injury may result.

Other instructions:

Danger

• Never modify the product. Otherwise electric shock or injury may result.





























This manual is related to the following products: