HP Anab EQ5 User Manual
Page 4
EQ5 AC Drive Operations Manual
_______________________________________________________________________
TECO – Westinghouse Motor Company
Compliance with UL
Instructions on maintenance, inspection, and replacement:
Danger
• Wait a minimum of five minutes (30HP/CT, 40HP/VT or less) or ten minutes (40HP/CT, 50HP/VT or more)
after power has been turned off (open) before starting an inspection. (Also confirm that the charge lamp is
off and that DC voltage between terminals P (+) and N (-) does not exceed 25V.) Otherwise electrical
shock may result.
• Only authorized personnel should perform maintenance, inspection, and replacement operations.(Take off
metal jewelry such as watches and rings and use insulated tools.) Otherwise electric shock or injury
may result.
Instructions on disposal:
Caution
• Treat as industrial waste when disposing it. Otherwise injury may result.
Other instructions:
Danger
• Never modify the product. Otherwise electric shock or injury may result.